RMA
You are not logged in

Glenair UK Ltd

40 Lower Oakham Way
Oakham Business Park
Mansfield, Notts
NG18 5BY
Tel: +44 1623 638100
Fax: +44 1623 638111
email: sales@glenair.co.uk

Earth Bonding System Overview

System Benefits


How Does it Work?

The earth bond comprises two components:

  1. A conical dowel having a male thread
  2. A cylindrical flanged bush

A tensile force is applied to the dowel using a hand hydraulic tool with a pre-determined pulling force. As the dowel is pulled through the bush, the bush remains fixed in the structure and expands within the hole making electrical contact. The tool completes its cycle resulting in a permanent electrical connection.


How do you Install it?

  1. Drill a hole in the mounting plate to a pre-determined diameter depending on the plate material, plate thickness and stud size selected
  2. Screw the bond into the nose of the hydraulic setting tool
  3. Insert the bond into the hole so that the flange is flush with the plate
  4. Pump the handle of the tool until an audible click is heard and release the tool from the stud
  5. Attach termination and tighten to required torque value

CONNECTION IS COMPLETE




About Us       Documentation       Site Map       Use of Cookies       Website Terms and Conditions
Glenair UK Ltd 40 Lower Oakham Way Oakham Business Park Mansfield, Notts NG18 5BY Tel: +44 1623 638100 Fax: +44 1623 638111 email: sales@glenair.co.uk  or Webmaster
VAT Registration No 118 4718 64
Copyright © 2009-2012 Glenair UK Ltd. All Rights Reserved
Glenair France    Glenair GmbH    Glenair Ibérica    Glenair Inc    Glenair Italy    Glenair Nordic